{"leader":"00688naa#a2200181#i#450#","fields":[{"001":"EN\\\\bibl\\84086"},{"005":"20241123102225.6"},{"011":{"ind1":"#","ind2":"#","subfields":[{"a":"2413-046X"}]}},{"100":{"ind1":"#","ind2":"#","subfields":[{"a":"20240627b2024####ek#y0engy0150####ca"}]}},{"102":{"ind1":"#","ind2":"#","subfields":[{"a":"RU"}]}},{"200":{"ind1":"1","ind2":"#","subfields":[{"a":"BIM TECHNOLOGIES FOR REAL ESTATE OBJECTS AT DIFFERENT STAGES OF THE BUILDING LIFE CYCLE. BENEFITS OF IMPLEMENTATION AND EVALUATION OF RETURN ON INVESTMENT"},{"e":"Journal article"}]}},{"210":{"ind1":"1","ind2":"#","subfields":[{"a":"Moscow"},{"c":"Electronic science"},{"d":"2024"}]}},{"215":{"ind1":"#","ind2":"#","subfields":[{"a":"24 \u00d1\u0081."}]}},{"608":{"ind1":"#","ind2":"#","subfields":[{"a":"Journal article"},{"2":"local"}]}},{"675":{"ind1":"#","ind2":"#","subfields":[{"a":"\u00d0\u00ad\u00d0\u00ba\u00d0\u00be\u00d0\u00bd\u00d0\u00be\u00d0\u00bc\u00d0\u00b8\u00d1\u0087\u00d0\u00b5\u00d1\u0081\u00d0\u00ba\u00d0\u00b8\u00d0\u00b9 \u00d1\u008d\u00d1\u0084\u00d1\u0084\u00d0\u00b5\u00d0\u00ba\u00d1\u0082 \u00d1\u0081\u00d1\u0082\u00d1\u0080\u00d0\u00be\u00d0\u00b8\u00d1\u0082\u00d0\u00b5\u00d0\u00bb\u00d1\u008c\u00d1\u0081\u00d1\u0082\u00d0\u00b2\u00d0\u00b0. 69.003.13"},{"z":""}]}},{"700":{"ind1":"#","ind2":"1","subfields":[{"a":"Bogatyrev"},{"g":"Nikolay Sergeevich"}]}},{"700":{"ind1":"#","ind2":"1","subfields":[{"a":"Liulin"},{"g":"Pavel Borisovitch"}]}},{"856":{"ind1":"4","ind2":"#","subfields":[{"a":"ecience.ru"},{"u":""}]}}]}